Topics
- Artificial intelligence (1)
- Building Information Modeling (3)
- Carbon footprint (5)
- Change (1)
- Climate neutral building (4)
- Climate protection (3)
- Cooling system (2)
- Cost efficiency (1)
- Customised solutions (3)
- Data centre (1)
- Delivery ready for installation (3)
- Digital transformation (1)
- Digital twin (3)
- District heating (3)
- Efficient assembly (5)
- Energy saving (2)
- EPD - Environmental Product Declaration (5)
- Geothermal energy (2)
- Heat pump (4)
- Industrial prefabrication (2)
- LCA Life cycle assessment (3)
- Leakage monitoring (1)
- Material (4)
- Materials (6)
- Minimising the carbon footprint (3)
- Plastic (13)
- Potable water (3)
- Power roof (1)
- Prefabrication (5)
- Processing (1)
- Push-fit fitting (2)
- Recyclable (2)
- Refurbishment (4)
- Shipbuilding (2)
- Skills shortage (1)
- Sports floor heating (1)
- Sprinkler system (1)
- Steel (1)
- Surface heating & cooling (6)
- Sustainability (15)
- Sustainable energy sources (7)
- Tight connection (1)
- Virtual building model (3)
Top posts
Sign up for our newsletter
Posts about
Climate neutral building
Sustainability,
Climate neutral building,
LCA Life cycle assessment,
EPD - Environmental Product Declaration,
Carbon footprint,
Plastic
Environmental Product Declaration (EPD): how to build more sustainably with aquatherm
The sustainability of buildings is becoming progressively important and is increasingly...
Reading time: 4 Min.
Sustainability,
Climate neutral building,
EPD - Environmental Product Declaration,
Carbon footprint,
Plastic
Environmental Product Declaration: The key to the green building industry
The building sector is responsible for around 38 percent of global CO2 emissions. Climate...
Reading time: 5 Min.
Climate neutral building,
LCA Life cycle assessment,
Minimising the carbon footprint,
EPD - Environmental Product Declaration
The influence of the construction industry on global energy consumption
In the fight against climate change, the construction industry is being called upon - and it must...
Reading time: 6 Min.